Groveland Mine RD over W Br Sturgeon River
FairDickinson County, Michigan · 7 MI W & 2 MI N of Felch · Structure no. 000000000002195
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 126
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Groveland Mine RD over W Br Sturgeon River is a prestressed concrete box beam or girders - multiple carrying Groveland Mine RD over W Br Sturgeon River in Dickinson County, Michigan. It was built in 1991, so it is 34 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 126 vehicles a day, roughly 17% of them trucks, projected to reach 139 by 2040. The structure is 56 ft (17 m) long and 34 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Groveland Mine RD over W Br Sturgeon River built?
It was built in 1991, making it 34 years old in 2025.
What condition is Groveland Mine RD over W Br Sturgeon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Groveland Mine RD over W Br Sturgeon River carry?
About 126 vehicles per day (2020 count), of which roughly 17% are trucks.
How long is Groveland Mine RD over W Br Sturgeon River?
The structure is 56 ft (17 m) long with a longest span of 54 ft (16.4 m) and a deck 34 ft wide.
Who owns Groveland Mine RD over W Br Sturgeon River?
It is owned by the County Highway Agency.