County Road No 5 over W Br Sturgeon River
GoodDickinson County, Michigan · 9 MI E & 3 MI N Merriman · Structure no. 000000000002196
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 20
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
County Road No 5 over W Br Sturgeon River is a prestressed concrete box beam or girders - multiple carrying County Road No 5 over W Br Sturgeon River in Dickinson County, Michigan. It was built in 2009, so it is 16 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 54% of them trucks, projected to reach 22 by 2040. The structure is 62 ft (18.9 m) long and 31 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road No 5 over W Br Sturgeon River built?
It was built in 2009, making it 16 years old in 2025.
What condition is County Road No 5 over W Br Sturgeon River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does County Road No 5 over W Br Sturgeon River carry?
About 20 vehicles per day (2020 count), of which roughly 54% are trucks.
How long is County Road No 5 over W Br Sturgeon River?
The structure is 62 ft (18.9 m) long with a longest span of 61 ft (18.5 m) and a deck 31 ft wide.
Who owns County Road No 5 over W Br Sturgeon River?
It is owned by the County Highway Agency.