M-69|CO HWY 569 over E Br Sturgeon River
FairDickinson County, Michigan · 2 MI E of Foster City · Structure no. 000000000002189
- Built
- 1931
- 94 years old, rebuilt 1994
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 553
- 2007 count
- Owner
- State
- State Highway Agency
About this bridge
M-69|CO HWY 569 over E Br Sturgeon River is a prestressed concrete stringer/multi-beam or girder carrying M-69|CO HWY 569 over E Br Sturgeon River in Dickinson County, Michigan. It was built in 1931 and reconstructed in 1994, so it is 94 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 553 vehicles a day, roughly 30% of them trucks, projected to reach 841 by 2018. The structure is 40 ft (12.2 m) long and 38 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-69|CO HWY 569 over E Br Sturgeon River built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1994.
What condition is M-69|CO HWY 569 over E Br Sturgeon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does M-69|CO HWY 569 over E Br Sturgeon River carry?
About 553 vehicles per day (2007 count), of which roughly 30% are trucks.
How long is M-69|CO HWY 569 over E Br Sturgeon River?
The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.5 m) and a deck 38 ft wide.
Who owns M-69|CO HWY 569 over E Br Sturgeon River?
It is owned by the State Highway Agency.