East-West Road over Naomikong Creek
FairPosted for loadChippewa County, Michigan · 10 MI N of Strongs · Structure no. 000000000001644
- Built
- 1947
- 78 years old
- Condition
- Fair
- inspected June 2023
- Type
- Other
- Wood or Timber
- Length
- 44 ft
- 2 main spans
- Daily traffic
- 30
- Owner
- County
- County Highway Agency
About this bridge
East-West Road over Naomikong Creek is a wood or timber other carrying East-West Road over Naomikong Creek in Chippewa County, Michigan. It was built in 1947, so it is 78 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, projected to reach 60 by 2019. The structure is 44 ft (13.4 m) long and 20 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was East-West Road over Naomikong Creek built?
It was built in 1947, making it 78 years old in 2025.
What condition is East-West Road over Naomikong Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does East-West Road over Naomikong Creek carry?
About 30 vehicles per day (latest count).
How long is East-West Road over Naomikong Creek?
The structure is 44 ft (13.4 m) long with a longest span of 22 ft (6.7 m) and a deck 20 ft wide.
Who owns East-West Road over Naomikong Creek?
It is owned by the County Highway Agency.