Main ST over Schoodic Str/Dolby Flowa
GoodPenobscot County, Maine · 100 Ft W Dolby Rest Area · Structure no. 2747
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected August 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 73 ft
- 1 main span
- Daily traffic
- 4,126
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Main ST over Schoodic Str/Dolby Flowa is a prestressed concrete tee beam carrying Main ST over Schoodic Str/Dolby Flowa in Penobscot County, Maine. It was built in 2017, so it is 8 years old, younger than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,126 vehicles a day, roughly 5% of them trucks, projected to reach 5,776 by 2036. The structure is 73 ft (22.4 m) long and 38 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST over Schoodic Str/Dolby Flowa built?
It was built in 2017, making it 8 years old in 2025.
What condition is Main ST over Schoodic Str/Dolby Flowa in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Main ST over Schoodic Str/Dolby Flowa carry?
About 4,126 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Main ST over Schoodic Str/Dolby Flowa?
The structure is 73 ft (22.4 m) long with a longest span of 71 ft (21.5 m) and a deck 38 ft wide.
Who owns Main ST over Schoodic Str/Dolby Flowa?
It is owned by the State Highway Agency.