Second ST over Millinocket Stream
FairPenobscot County, Maine · 200 Ft E Aroostook Ave · Structure no. 0914
- Built
- 1964
- 61 years old, rebuilt 1997
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 90 ft
- 1 main span
- Daily traffic
- 359
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Second ST over Millinocket Stream is a steel stringer/multi-beam or girder carrying Second ST over Millinocket Stream in Penobscot County, Maine. It was built in 1964 and reconstructed in 1997, so it is 61 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 359 vehicles a day, roughly 5% of them trucks, projected to reach 574 by 2036. The structure is 90 ft (27.4 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second ST over Millinocket Stream built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1997.
What condition is Second ST over Millinocket Stream in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Second ST over Millinocket Stream carry?
About 359 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Second ST over Millinocket Stream?
The structure is 90 ft (27.4 m) long with a longest span of 85 ft (25.9 m) and a deck 32 ft wide.
Who owns Second ST over Millinocket Stream?
It is owned by the State Highway Agency.