Upper Level Roadwa over Lower Level Roadway
FairPosted for loadAnne Arundel County, Maryland · Bwi Airport · Structure no. 300000AAMA17010
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 1,039 ft
- 40 main spans
- Daily traffic
- 12,589
- 2024 count
- Owner
- State
- Other State Agency
About this bridge
Upper Level Roadwa over Lower Level Roadway is a concrete continuous slab carrying Upper Level Roadwa over Lower Level Roadway in Anne Arundel County, Maryland. It was built in 2002, so it is 23 years old, younger than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 12,589 vehicles a day, roughly 5% of them trucks, projected to reach 18,710 by 2044. The structure is 1,039 ft (316.7 m) long and 131 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Upper Level Roadwa over Lower Level Roadway built?
It was built in 2002, making it 23 years old in 2025.
What condition is Upper Level Roadwa over Lower Level Roadway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Upper Level Roadwa over Lower Level Roadway carry?
About 12,589 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Upper Level Roadwa over Lower Level Roadway?
The structure is 1,039 ft (316.7 m) long with a longest span of 44 ft (13.4 m) and a deck 131 ft wide.
Who owns Upper Level Roadwa over Lower Level Roadway?
It is owned by the Other State Agency.