I 290 EB over ST 70 Lncln ST & on Ramp
FairWorcester County, Massachusetts · .25 Mi. N. of ST-9 · Structure no. W440951TCDOTNBI
- Built
- 1961
- 64 years old, rebuilt 1982
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 170 ft
- 2 main spans
- Daily traffic
- 69,694
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 290 EB over ST 70 Lncln ST & on Ramp is a steel stringer/multi-beam or girder carrying I 290 EB over ST 70 Lncln ST & on Ramp in Worcester County, Massachusetts. It was built in 1961 and reconstructed in 1982, so it is 64 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 69,694 vehicles a day, roughly 15% of them trucks, projected to reach 94,758 by 2032. The structure is 170 ft (51.9 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 290 EB over ST 70 Lncln ST & on Ramp built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1982.
What condition is I 290 EB over ST 70 Lncln ST & on Ramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does I 290 EB over ST 70 Lncln ST & on Ramp carry?
About 69,694 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is I 290 EB over ST 70 Lncln ST & on Ramp?
The structure is 170 ft (51.9 m) long with a longest span of 83 ft (25.3 m) and a deck 62 ft wide.
Who owns I 290 EB over ST 70 Lncln ST & on Ramp?
It is owned by the State Highway Agency.