I 290 EB over Comb 4 City Sts & CSX
FairWorcester County, Massachusetts · 1000 Ft N of Harrison ST · Structure no. W440821T7DOTNBI
- Built
- 1958
- 67 years old, rebuilt 2007
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,555 ft
- 11 main spans
- Daily traffic
- 64,769
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
I 290 EB over Comb 4 City Sts & CSX is a steel stringer/multi-beam or girder carrying I 290 EB over Comb 4 City Sts & CSX in Worcester County, Massachusetts. It was built in 1958 and reconstructed in 2007, so it is 67 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 64,769 vehicles a day, roughly 7% of them trucks, projected to reach 173,723 by 2031. The structure is 1,555 ft (474 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 290 EB over Comb 4 City Sts & CSX built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2007.
What condition is I 290 EB over Comb 4 City Sts & CSX in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does I 290 EB over Comb 4 City Sts & CSX carry?
About 64,769 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is I 290 EB over Comb 4 City Sts & CSX?
The structure is 1,555 ft (474 m) long with a longest span of 160 ft (48.8 m) and a deck 57 ft wide.
Who owns I 290 EB over Comb 4 City Sts & CSX?
It is owned by the State Highway Agency.