ST 2 EB over HWY Bacon ST
FairWorcester County, Massachusetts · MM91.1 .25 MI N of ST-2A · Structure no. W280221NYDOTNBI
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 23,594
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 EB over HWY Bacon ST is a steel stringer/multi-beam or girder carrying ST 2 EB over HWY Bacon ST in Worcester County, Massachusetts. It was built in 1965, so it is 60 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,594 vehicles a day, roughly 11% of them trucks, projected to reach 31,586 by 2031. The structure is 122 ft (37.3 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 EB over HWY Bacon ST built?
It was built in 1965, making it 60 years old in 2025.
What condition is ST 2 EB over HWY Bacon ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does ST 2 EB over HWY Bacon ST carry?
About 23,594 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is ST 2 EB over HWY Bacon ST?
The structure is 122 ft (37.3 m) long with a longest span of 59 ft (17.9 m) and a deck 43 ft wide.
Who owns ST 2 EB over HWY Bacon ST?
It is owned by the State Highway Agency.