ST 2 EB over ST140 W Main ST
GoodWorcester County, Massachusetts · 89.7 Mm on Route 2 · Structure no. W280215X1DOTNBI
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 188 ft
- 3 main spans
- Daily traffic
- 18,681
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 EB over ST140 W Main ST is a steel continuous stringer/multi-beam or girder carrying ST 2 EB over ST140 W Main ST in Worcester County, Massachusetts. It was built in 2013, so it is 12 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,681 vehicles a day, roughly 5% of them trucks. The structure is 188 ft (57.4 m) long and 57 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 EB over ST140 W Main ST built?
It was built in 2013, making it 12 years old in 2025.
What condition is ST 2 EB over ST140 W Main ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does ST 2 EB over ST140 W Main ST carry?
About 18,681 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is ST 2 EB over ST140 W Main ST?
The structure is 188 ft (57.4 m) long with a longest span of 95 ft (29.1 m) and a deck 57 ft wide.
Who owns ST 2 EB over ST140 W Main ST?
It is owned by the State Highway Agency.