ST 2 over HWY White Pond RD
GoodWorcester County, Massachusetts · Mm 71.7 on ST 2 · Structure no. A1503319QDOTNBI
- Built
- 1954
- 71 years old, rebuilt 2012
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 75 ft
- 1 main span
- Daily traffic
- 9,372
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 over HWY White Pond RD is a steel stringer/multi-beam or girder carrying ST 2 over HWY White Pond RD in Worcester County, Massachusetts. It was built in 1954 and reconstructed in 2012, so it is 71 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,372 vehicles a day, roughly 9% of them trucks, projected to reach 17,320 by 2032. The structure is 75 ft (22.8 m) long and 52 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 over HWY White Pond RD built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2012.
What condition is ST 2 over HWY White Pond RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does ST 2 over HWY White Pond RD carry?
About 9,372 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is ST 2 over HWY White Pond RD?
The structure is 75 ft (22.8 m) long with a longest span of 70 ft (21.3 m) and a deck 52 ft wide.
Who owns ST 2 over HWY White Pond RD?
It is owned by the State Highway Agency.