ST 2 over Water Lake Rohunta
GoodWorcester County, Massachusetts · Mm 71.3 on Rt 2 · Structure no. A1503019LDOTNBI
- Built
- 1955
- 70 years old, rebuilt 2010
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 11,683
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 over Water Lake Rohunta is a prestressed concrete box beam or girders - single or spread carrying ST 2 over Water Lake Rohunta in Worcester County, Massachusetts. It was built in 1955 and reconstructed in 2010, so it is 70 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,683 vehicles a day, roughly 8% of them trucks, projected to reach 13,478 by 2032. The structure is 56 ft (17.2 m) long and 52 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 over Water Lake Rohunta built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 2010.
What condition is ST 2 over Water Lake Rohunta in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does ST 2 over Water Lake Rohunta carry?
About 11,683 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is ST 2 over Water Lake Rohunta?
The structure is 56 ft (17.2 m) long with a longest span of 52 ft (16 m) and a deck 52 ft wide.
Who owns ST 2 over Water Lake Rohunta?
It is owned by the State Highway Agency.