HWY Shawmut Ave over Comb Amtrak/Mbta
FairSuffolk County, Massachusetts · Over Orange Line · Structure no. B160804V5MUNNBI
- Built
- 1932
- 93 years old, rebuilt 1975
- Condition
- Fair
- inspected November 2021
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 56 ft
- 1 main span
- Daily traffic
- 8,700
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
HWY Shawmut Ave over Comb Amtrak/Mbta is a steel stringer/multi-beam or girder carrying HWY Shawmut Ave over Comb Amtrak/Mbta in Suffolk County, Massachusetts. It was built in 1932 and reconstructed in 1975, so it is 93 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,700 vehicles a day, roughly 5% of them trucks, projected to reach 14,056 by 2032. The structure is 56 ft (17.1 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Shawmut Ave over Comb Amtrak/Mbta built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1975.
What condition is HWY Shawmut Ave over Comb Amtrak/Mbta in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2021.
How much traffic does HWY Shawmut Ave over Comb Amtrak/Mbta carry?
About 8,700 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is HWY Shawmut Ave over Comb Amtrak/Mbta?
The structure is 56 ft (17.1 m) long with a longest span of 56 ft (17.1 m) and a deck 62 ft wide.
Who owns HWY Shawmut Ave over Comb Amtrak/Mbta?
It is owned by the City or Municipal Highway Agency.