US Bridges

HWY Harrison Ave over Comb I 90 & Amtrak/Mbta

Poor

Suffolk County, Massachusetts · .16 KM W. I93 S72 · Structure no. B160784RNDOTNBI

Built
1965
60 years old
Condition
Poor
inspected October 2021
Type
Stringer/Multi-beam or Girder
Steel
Length
209 ft
4 main spans
Daily traffic
7,500
2019 count
Owner
State
State Highway Agency

About this bridge

HWY Harrison Ave over Comb I 90 & Amtrak/Mbta is a steel stringer/multi-beam or girder carrying HWY Harrison Ave over Comb I 90 & Amtrak/Mbta in Suffolk County, Massachusetts. It was built in 1965, so it is 60 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 7,500 vehicles a day, roughly 10% of them trucks, projected to reach 14,056 by 2031. The structure is 209 ft (63.7 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHWY Harrison Ave
CrossesComb I 90 & Amtrak/Mbta
Location.16 KM W. I93 S72
RouteInterstate 90
Coordinates42.34676, -71.06311
Functional classUrban Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionOctober 2021
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.6 US tons
Inventory rating39.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length209 ft (63.7 m)
Longest span65 ft (19.8 m)
Deck width66 ft (20.2 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,500 (2019)
Projected traffic14,056 by 2031
Trucks10%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$12.6 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Harrison Ave over Comb I 90 & Amtrak/Mbta built?

It was built in 1965, making it 60 years old in 2025.

What condition is HWY Harrison Ave over Comb I 90 & Amtrak/Mbta in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2021.

How much traffic does HWY Harrison Ave over Comb I 90 & Amtrak/Mbta carry?

About 7,500 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is HWY Harrison Ave over Comb I 90 & Amtrak/Mbta?

The structure is 209 ft (63.7 m) long with a longest span of 65 ft (19.8 m) and a deck 66 ft wide.

Who owns HWY Harrison Ave over Comb I 90 & Amtrak/Mbta?

It is owned by the State Highway Agency.