ST 3 SB Plgm HWY over HWY High ST
GoodPlymouth County, Massachusetts · 1 MI N of JCT RTE 53 & 3 · Structure no. N24003BRCDOTNBI
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 109 ft
- 1 main span
- Daily traffic
- 34,714
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST 3 SB Plgm HWY over HWY High ST is a steel stringer/multi-beam or girder carrying ST 3 SB Plgm HWY over HWY High ST in Plymouth County, Massachusetts. It was built in 2019, so it is 6 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 34,714 vehicles a day, roughly 5% of them trucks. The structure is 109 ft (33.2 m) long and 59 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 3 SB Plgm HWY over HWY High ST built?
It was built in 2019, making it 6 years old in 2025.
What condition is ST 3 SB Plgm HWY over HWY High ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does ST 3 SB Plgm HWY over HWY High ST carry?
About 34,714 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is ST 3 SB Plgm HWY over HWY High ST?
The structure is 109 ft (33.2 m) long with a longest span of 104 ft (31.6 m) and a deck 59 ft wide.
Who owns ST 3 SB Plgm HWY over HWY High ST?
It is owned by the State Highway Agency.