ST 3 NB Plgm HWY over ST123 Webster ST
GoodPlymouth County, Massachusetts · .2 MI S of Norwell Tl · Structure no. H06010BRDDOTNBI
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 100 ft
- 1 main span
- Daily traffic
- 64,267
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST 3 NB Plgm HWY over ST123 Webster ST is a steel stringer/multi-beam or girder carrying ST 3 NB Plgm HWY over ST123 Webster ST in Plymouth County, Massachusetts. It was built in 2019, so it is 6 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 64,267 vehicles a day, roughly 5% of them trucks. The structure is 100 ft (30.6 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 3 NB Plgm HWY over ST123 Webster ST built?
It was built in 2019, making it 6 years old in 2025.
What condition is ST 3 NB Plgm HWY over ST123 Webster ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does ST 3 NB Plgm HWY over ST123 Webster ST carry?
About 64,267 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is ST 3 NB Plgm HWY over ST123 Webster ST?
The structure is 100 ft (30.6 m) long with a longest span of 95 ft (29 m) and a deck 59 ft wide.
Who owns ST 3 NB Plgm HWY over ST123 Webster ST?
It is owned by the State Highway Agency.