ST 38 Main ST over Water Aberjona River
FairMiddlesex County, Massachusetts · .16 Km. E. of Rt. 38 · Structure no. W400042DAMUNNBI
- Built
- 1915
- 110 years old
- Condition
- Fair
- inspected December 2023
- Type
- Arch - Deck
- Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 10,732
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
ST 38 Main ST over Water Aberjona River is a concrete arch - deck carrying ST 38 Main ST over Water Aberjona River in Middlesex County, Massachusetts. It was built in 1915, so it is 110 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,732 vehicles a day, roughly 10% of them trucks, projected to reach 14,909 by 2032. The structure is 35 ft (10.7 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 38 Main ST over Water Aberjona River built?
It was built in 1915, making it 110 years old in 2025.
What condition is ST 38 Main ST over Water Aberjona River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does ST 38 Main ST over Water Aberjona River carry?
About 10,732 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is ST 38 Main ST over Water Aberjona River?
The structure is 35 ft (10.7 m) long with a longest span of 35 ft (10.7 m) and a deck 73 ft wide.
Who owns ST 38 Main ST over Water Aberjona River?
It is owned by the Town or Township Highway Agency.