I 90 WB over ST126 Concord ST
FairMiddlesex County, Massachusetts · Mm 115.8 W of Ex 117 · Structure no. F070584P6DOTNBI
- Built
- 1957
- 68 years old, rebuilt 1989
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 125 ft
- 3 main spans
- Daily traffic
- 52,861
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 WB over ST126 Concord ST is a steel stringer/multi-beam or girder carrying I 90 WB over ST126 Concord ST in Middlesex County, Massachusetts. It was built in 1957 and reconstructed in 1989, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 52,861 vehicles a day, roughly 8% of them trucks, projected to reach 86,862 by 2032. The structure is 125 ft (38.1 m) long and 64 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 WB over ST126 Concord ST built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1989.
What condition is I 90 WB over ST126 Concord ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I 90 WB over ST126 Concord ST carry?
About 52,861 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is I 90 WB over ST126 Concord ST?
The structure is 125 ft (38.1 m) long with a longest span of 62 ft (19 m) and a deck 64 ft wide.
Who owns I 90 WB over ST126 Concord ST?
It is owned by the State Highway Agency.