I 90 EB over Other Cochituate Trail
FairMiddlesex County, Massachusetts · I-90 Mm 116.4 · Structure no. F070474P2DOTNBI
- Built
- 1957
- 68 years old, rebuilt 1996
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 141 ft
- 3 main spans
- Daily traffic
- 48,475
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 EB over Other Cochituate Trail is a steel continuous stringer/multi-beam or girder carrying I 90 EB over Other Cochituate Trail in Middlesex County, Massachusetts. It was built in 1957 and reconstructed in 1996, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 48,475 vehicles a day, roughly 8% of them trucks, projected to reach 82,124 by 2032. The structure is 141 ft (43 m) long and 73 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 EB over Other Cochituate Trail built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1996.
What condition is I 90 EB over Other Cochituate Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does I 90 EB over Other Cochituate Trail carry?
About 48,475 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is I 90 EB over Other Cochituate Trail?
The structure is 141 ft (43 m) long with a longest span of 52 ft (15.8 m) and a deck 73 ft wide.
Who owns I 90 EB over Other Cochituate Trail?
It is owned by the State Highway Agency.