I 90 EB over Water Mdc Res 3
GoodMiddlesex County, Massachusetts · Mm 112/E of Exit 111/ST9 · Structure no. F070454PHDOTNBI
- Built
- 1957
- 68 years old, rebuilt 2020
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 129 ft
- 3 main spans
- Daily traffic
- 52,197
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 EB over Water Mdc Res 3 is a steel continuous stringer/multi-beam or girder carrying I 90 EB over Water Mdc Res 3 in Middlesex County, Massachusetts. It was built in 1957 and reconstructed in 2020, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 52,197 vehicles a day, roughly 8% of them trucks, projected to reach 129,503 by 2033. The structure is 129 ft (39.3 m) long and 64 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 EB over Water Mdc Res 3 built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2020.
What condition is I 90 EB over Water Mdc Res 3 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does I 90 EB over Water Mdc Res 3 carry?
About 52,197 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is I 90 EB over Water Mdc Res 3?
The structure is 129 ft (39.3 m) long with a longest span of 48 ft (14.6 m) and a deck 64 ft wide.
Who owns I 90 EB over Water Mdc Res 3?
It is owned by the State Highway Agency.