I 495 over Comb Merrimac ST & MBTA
FairEssex County, Massachusetts · .32 KM S Merrimac River · Structure no. L040372XBDOTNBI
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 391 ft
- 6 main spans
- Daily traffic
- 96,595
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
I 495 over Comb Merrimac ST & MBTA is a steel stringer/multi-beam or girder carrying I 495 over Comb Merrimac ST & MBTA in Essex County, Massachusetts. It was built in 1962, so it is 63 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 96,595 vehicles a day, roughly 12% of them trucks, projected to reach 149,718 by 2032. The structure is 391 ft (119.2 m) long and 95 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 495 over Comb Merrimac ST & MBTA built?
It was built in 1962, making it 63 years old in 2025.
What condition is I 495 over Comb Merrimac ST & MBTA in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does I 495 over Comb Merrimac ST & MBTA carry?
About 96,595 vehicles per day (2019 count), of which roughly 12% are trucks.
How long is I 495 over Comb Merrimac ST & MBTA?
The structure is 391 ft (119.2 m) long with a longest span of 103 ft (31.3 m) and a deck 95 ft wide.
Who owns I 495 over Comb Merrimac ST & MBTA?
It is owned by the State Highway Agency.