US Bridges

I 495 NB over Water Merrimack River

Good

Essex County, Massachusetts · .4 MI S ST110 · Structure no. H12039C32DOTNBI

Built
2021
4 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
722 ft
3 main spans
Daily traffic
60,941
2023 count
Owner
State
State Highway Agency

About this bridge

I 495 NB over Water Merrimack River is a steel continuous stringer/multi-beam or girder carrying I 495 NB over Water Merrimack River in Essex County, Massachusetts. It was built in 2021, so it is 4 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60,941 vehicles a day, roughly 1% of them trucks. The structure is 722 ft (220 m) long and 79 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 495 NB
CrossesWater Merrimack River
Location.4 MI S ST110
RouteInterstate 495
Coordinates42.76851, -71.12023
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length722 ft (220 m)
Longest span278 ft (84.7 m)
Deck width79 ft (24.2 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60,941 (2023)
Projected traffic—
Trucks1%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 495 NB over Water Merrimack River built?

It was built in 2021, making it 4 years old in 2025.

What condition is I 495 NB over Water Merrimack River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I 495 NB over Water Merrimack River carry?

About 60,941 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is I 495 NB over Water Merrimack River?

The structure is 722 ft (220 m) long with a longest span of 278 ft (84.7 m) and a deck 79 ft wide.

Who owns I 495 NB over Water Merrimack River?

It is owned by the State Highway Agency.