US Bridges

I 495 NB over Water Merrimack River

Poor

Essex County, Massachusetts · At Methuen Town Line · Structure no. H120402WLDOTNBI

Built
1964
61 years old
Condition
Poor
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
946 ft
7 main spans
Daily traffic
60,056
2022 count
Owner
State
State Highway Agency

About this bridge

I 495 NB over Water Merrimack River is a steel continuous stringer/multi-beam or girder carrying I 495 NB over Water Merrimack River in Essex County, Massachusetts. It was built in 1964, so it is 61 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, would be posted or closed except for temporary shoring.

It carries about 60,056 vehicles a day, roughly 9% of them trucks, projected to reach 133,609 by 2031. The structure is 946 ft (288.4 m) long and 52 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesI 495 NB
CrossesWater Merrimack River
LocationAt Methuen Town Line
RouteInterstate 495
Coordinates42.75453, -71.12705
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 6 months
Operating statusOpen, would be posted or closed except for temporary shoring
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.8 US tons
Inventory rating36.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20 + Mod
Structure length946 ft (288.4 m)
Longest span193 ft (58.8 m)
Deck width52 ft (15.9 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60,056 (2022)
Projected traffic133,609 by 2031
Trucks9%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$44.7 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was I 495 NB over Water Merrimack River built?

It was built in 1964, making it 61 years old in 2025.

What condition is I 495 NB over Water Merrimack River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.

How much traffic does I 495 NB over Water Merrimack River carry?

About 60,056 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is I 495 NB over Water Merrimack River?

The structure is 946 ft (288.4 m) long with a longest span of 193 ft (58.8 m) and a deck 52 ft wide.

Who owns I 495 NB over Water Merrimack River?

It is owned by the State Highway Agency.