US Bridges

HWY Third ST over I 195

Fair

Bristol County, Massachusetts · At City Hall · Structure no. F020643XHDOTNBI

Built
1964
61 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
135 ft
2 main spans
Daily traffic
4,900
2024 count
Owner
State
State Highway Agency

About this bridge

HWY Third ST over I 195 is a steel continuous stringer/multi-beam or girder carrying HWY Third ST over I 195 in Bristol County, Massachusetts. It was built in 1964, so it is 61 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,900 vehicles a day, roughly 7% of them trucks, projected to reach 17,530 by 2031. The structure is 135 ft (41.3 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesHWY Third ST
CrossesI 195
LocationAt City Hall
RouteCity Street 0
Coordinates41.70053, -71.15409
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.7 US tons
Inventory rating34 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length135 ft (41.3 m)
Longest span66 ft (20.1 m)
Deck width80 ft (24.4 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,900 (2024)
Projected traffic17,530 by 2031
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$10 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Third ST over I 195 built?

It was built in 1964, making it 61 years old in 2025.

What condition is HWY Third ST over I 195 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does HWY Third ST over I 195 carry?

About 4,900 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is HWY Third ST over I 195?

The structure is 135 ft (41.3 m) long with a longest span of 66 ft (20.1 m) and a deck 80 ft wide.

Who owns HWY Third ST over I 195?

It is owned by the State Highway Agency.