US Bridges

I 95 NB over HWY Tiffany ST

Fair

Bristol County, Massachusetts · .5 MI SW of 123 & 95 · Structure no. A160483QCDOTNBI

Built
1959
66 years old
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
1 main span
Daily traffic
28,571
2023 count
Owner
State
State Highway Agency

About this bridge

I 95 NB over HWY Tiffany ST is a steel stringer/multi-beam or girder carrying I 95 NB over HWY Tiffany ST in Bristol County, Massachusetts. It was built in 1959, so it is 66 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 28,571 vehicles a day, roughly 7% of them trucks, projected to reach 78,965 by 2032. The structure is 60 ft (18.3 m) long and 57 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesI 95 NB
CrossesHWY Tiffany ST
Location.5 MI SW of 123 & 95
RouteInterstate 95
Coordinates41.92809, -71.32377
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.2 US tons
Inventory rating36.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span56 ft (17.1 m)
Deck width57 ft (17.4 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,571 (2023)
Projected traffic78,965 by 2032
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3.4 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 95 NB over HWY Tiffany ST built?

It was built in 1959, making it 66 years old in 2025.

What condition is I 95 NB over HWY Tiffany ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does I 95 NB over HWY Tiffany ST carry?

About 28,571 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is I 95 NB over HWY Tiffany ST?

The structure is 60 ft (18.3 m) long with a longest span of 56 ft (17.1 m) and a deck 57 ft wide.

Who owns I 95 NB over HWY Tiffany ST?

It is owned by the State Highway Agency.