US Bridges

I 95 SB over HWY Tiffany ST

Good

Bristol County, Massachusetts · .5 Mi. Sw. of 123 & 95 · Structure no. A160473QBDOTNBI

Built
1959
66 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
64 ft
1 main span
Daily traffic
44,095
2023 count
Owner
State
State Highway Agency

About this bridge

I 95 SB over HWY Tiffany ST is a steel stringer/multi-beam or girder carrying I 95 SB over HWY Tiffany ST in Bristol County, Massachusetts. It was built in 1959, so it is 66 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 44,095 vehicles a day, roughly 21% of them trucks, projected to reach 78,965 by 2032. The structure is 64 ft (19.5 m) long and 57 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesI 95 SB
CrossesHWY Tiffany ST
Location.5 Mi. Sw. of 123 & 95
RouteInterstate 95
Coordinates41.92865, -71.32436
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.7 US tons
Inventory rating37.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length64 ft (19.5 m)
Longest span60 ft (18.3 m)
Deck width57 ft (17.4 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44,095 (2023)
Projected traffic78,965 by 2032
Trucks21%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$890,000 (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 95 SB over HWY Tiffany ST built?

It was built in 1959, making it 66 years old in 2025.

What condition is I 95 SB over HWY Tiffany ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does I 95 SB over HWY Tiffany ST carry?

About 44,095 vehicles per day (2023 count), of which roughly 21% are trucks.

How long is I 95 SB over HWY Tiffany ST?

The structure is 64 ft (19.5 m) long with a longest span of 60 ft (18.3 m) and a deck 57 ft wide.

Who owns I 95 SB over HWY Tiffany ST?

It is owned by the State Highway Agency.