ST 2 /ST8/UNION over Water N Br Hoosic River
FairBerkshire County, Massachusetts · At Cliff Street · Structure no. N140130AFDOTNBI
- Built
- 1958
- 67 years old, rebuilt 1983
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 82 ft
- 1 main span
- Daily traffic
- 8,000
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 /ST8/UNION over Water N Br Hoosic River is a steel stringer/multi-beam or girder carrying ST 2 /ST8/UNION over Water N Br Hoosic River in Berkshire County, Massachusetts. It was built in 1958 and reconstructed in 1983, so it is 67 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,000 vehicles a day, roughly 14% of them trucks, projected to reach 11,845 by 2032. The structure is 82 ft (25 m) long and 47 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 /ST8/UNION over Water N Br Hoosic River built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1983.
What condition is ST 2 /ST8/UNION over Water N Br Hoosic River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does ST 2 /ST8/UNION over Water N Br Hoosic River carry?
About 8,000 vehicles per day (2019 count), of which roughly 14% are trucks.
How long is ST 2 /ST8/UNION over Water N Br Hoosic River?
The structure is 82 ft (25 m) long with a longest span of 71 ft (21.6 m) and a deck 47 ft wide.
Who owns ST 2 /ST8/UNION over Water N Br Hoosic River?
It is owned by the State Highway Agency.