ST 2 /ST8/UNION over Water N Br Hoosic River
GoodBerkshire County, Massachusetts · At Canal Street · Structure no. N140120AGDOTNBI
- Built
- 1956
- 69 years old, rebuilt 1983
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 55 ft
- 1 main span
- Daily traffic
- 5,571
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 /ST8/UNION over Water N Br Hoosic River is a steel stringer/multi-beam or girder carrying ST 2 /ST8/UNION over Water N Br Hoosic River in Berkshire County, Massachusetts. It was built in 1956 and reconstructed in 1983, so it is 69 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,571 vehicles a day, roughly 14% of them trucks, projected to reach 11,845 by 2032. The structure is 55 ft (16.8 m) long and 46 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 /ST8/UNION over Water N Br Hoosic River built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1983.
What condition is ST 2 /ST8/UNION over Water N Br Hoosic River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does ST 2 /ST8/UNION over Water N Br Hoosic River carry?
About 5,571 vehicles per day (2019 count), of which roughly 14% are trucks.
How long is ST 2 /ST8/UNION over Water N Br Hoosic River?
The structure is 55 ft (16.8 m) long with a longest span of 46 ft (14 m) and a deck 46 ft wide.
Who owns ST 2 /ST8/UNION over Water N Br Hoosic River?
It is owned by the State Highway Agency.