US Bridges

Neil Wagoner over Creosote Branch

Fair

Winn Parish, Louisiana · 0.48 Mi. East of LA 34 · Structure no. 086431546923861

Built
1985
40 years old
Condition
Fair
inspected November 2024
Type
Channel Beam
Prestressed Concrete
Length
26 ft
1 main span
Daily traffic
400
2022 count
Owner
County
County Highway Agency

About this bridge

Neil Wagoner over Creosote Branch is a prestressed concrete channel beam carrying Neil Wagoner over Creosote Branch in Winn Parish, Louisiana. It was built in 1985, so it is 40 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 400 vehicles a day, projected to reach 440 by 2042. The structure is 26 ft (7.9 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNeil Wagoner
CrossesCreosote Branch
Location0.48 Mi. East of LA 34
RouteCounty Highway 0
Coordinates31.91008, -92.6433
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating30 US tons
Inventory rating23.3 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width25 ft (7.6 m)
Roadway width22 ft (6.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2022)
Projected traffic440 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Neil Wagoner over Creosote Branch built?

It was built in 1985, making it 40 years old in 2025.

What condition is Neil Wagoner over Creosote Branch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Neil Wagoner over Creosote Branch carry?

About 400 vehicles per day (2022 count).

How long is Neil Wagoner over Creosote Branch?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 25 ft wide.

Who owns Neil Wagoner over Creosote Branch?

It is owned by the County Highway Agency.