US Bridges

Coochie Brake over Coochie Break Creek

Fair

Winn Parish, Louisiana · 2.7 Mi. North of LA 34 · Structure no. 086431474925041

Built
1965
60 years old
Condition
Fair
inspected November 2024
Type
Channel Beam
Prestressed Concrete
Length
80 ft
4 main spans
Daily traffic
15
2022 count
Owner
County
County Highway Agency

About this bridge

Coochie Brake over Coochie Break Creek is a prestressed concrete channel beam carrying Coochie Brake over Coochie Break Creek in Winn Parish, Louisiana. It was built in 1965, so it is 60 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15 vehicles a day, projected to reach 16 by 2042. The structure is 80 ft (24.4 m) long and 17 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCoochie Brake
CrossesCoochie Break Creek
Location2.7 Mi. North of LA 34
RouteCounty Highway 0
Coordinates31.78845, -92.8411
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating29.7 US tons
Inventory rating18.2 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span20 ft (6.1 m)
Deck width17 ft (5.1 m)
Roadway width15 ft (4.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2022)
Projected traffic16 by 2042
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Coochie Brake over Coochie Break Creek built?

It was built in 1965, making it 60 years old in 2025.

What condition is Coochie Brake over Coochie Break Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Coochie Brake over Coochie Break Creek carry?

About 15 vehicles per day (2022 count).

How long is Coochie Brake over Coochie Break Creek?

The structure is 80 ft (24.4 m) long with a longest span of 20 ft (6.1 m) and a deck 17 ft wide.

Who owns Coochie Brake over Coochie Break Creek?

It is owned by the County Highway Agency.