US Bridges

US0167 over Port Deluce Creek Relief

Fair

Winn Parish, Louisiana · 0.11 Mi. South of LA 501 · Structure no. 086400230501832

Built
1991
34 years old
Condition
Fair
inspected December 2023
Type
Slab
Concrete
Length
120 ft
6 main spans
Daily traffic
10,307
2021 count
Owner
State
State Highway Agency

About this bridge

US0167 over Port Deluce Creek Relief is a concrete slab carrying US0167 over Port Deluce Creek Relief in Winn Parish, Louisiana. It was built in 1991, so it is 34 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,307 vehicles a day, roughly 14% of them trucks, projected to reach 11,337 by 2041. The structure is 120 ft (36.6 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS0167
CrossesPort Deluce Creek Relief
Location0.11 Mi. South of LA 501
RouteU.S. Route 167
Coordinates31.9419, -92.6539
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span20 ft (6.1 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,307 (2021)
Projected traffic11,337 by 2041
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US0167 over Port Deluce Creek Relief built?

It was built in 1991, making it 34 years old in 2025.

What condition is US0167 over Port Deluce Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does US0167 over Port Deluce Creek Relief carry?

About 10,307 vehicles per day (2021 count), of which roughly 14% are trucks.

How long is US0167 over Port Deluce Creek Relief?

The structure is 120 ft (36.6 m) long with a longest span of 20 ft (6.1 m) and a deck 43 ft wide.

Who owns US0167 over Port Deluce Creek Relief?

It is owned by the State Highway Agency.