US Bridges

LA0421 over Dry Creek

Fair

West Feliciana Parish, Louisiana · 4.16 MI S JCT US 61-LA421 · Structure no. 616308630204161

Built
1982
43 years old
Condition
Fair
inspected December 2024
Type
Slab
Concrete
Length
114 ft
6 main spans
Daily traffic
739
2021 count
Owner
State
State Highway Agency

About this bridge

LA0421 over Dry Creek is a concrete slab carrying LA0421 over Dry Creek in West Feliciana Parish, Louisiana. It was built in 1982, so it is 43 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 739 vehicles a day, roughly 14% of them trucks, projected to reach 812 by 2041. The structure is 114 ft (34.7 m) long and 31 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesLA0421
CrossesDry Creek
Location4.16 MI S JCT US 61-LA421
RouteState Highway 421
Coordinates30.91808, -91.29934
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating72 US tons
Inventory rating43 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans6
Design loadHS 20
Structure length114 ft (34.7 m)
Longest span19 ft (5.8 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic739 (2021)
Projected traffic812 by 2041
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was LA0421 over Dry Creek built?

It was built in 1982, making it 43 years old in 2025.

What condition is LA0421 over Dry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does LA0421 over Dry Creek carry?

About 739 vehicles per day (2021 count), of which roughly 14% are trucks.

How long is LA0421 over Dry Creek?

The structure is 114 ft (34.7 m) long with a longest span of 19 ft (5.8 m) and a deck 31 ft wide.

Who owns LA0421 over Dry Creek?

It is owned by the State Highway Agency.