Cypress Point RD over Coulee
FairPosted for loadVermilion Parish, Louisiana · 2 MI E of LA 14 · Structure no. 035730036923731
- Built
- 1960
- 65 years old, rebuilt 2018
- Condition
- Fair
- inspected July 2023
- Type
- Channel Beam
- Concrete
- Length
- 46 ft
- 2 main spans
- Daily traffic
- 288
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Cypress Point RD over Coulee is a concrete channel beam carrying Cypress Point RD over Coulee in Vermilion Parish, Louisiana. It was built in 1960 and reconstructed in 2018, so it is 65 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 288 vehicles a day, projected to reach 316 by 2042. The structure is 46 ft (14 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cypress Point RD over Coulee built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2018.
What condition is Cypress Point RD over Coulee in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Cypress Point RD over Coulee carry?
About 288 vehicles per day (2022 count).
How long is Cypress Point RD over Coulee?
The structure is 46 ft (14 m) long with a longest span of 23 ft (7 m) and a deck 25 ft wide.
Who owns Cypress Point RD over Coulee?
It is owned by the County Highway Agency.