US Bridges

Pelican RD over Magee Canal

FairPosted for load

Vermilion Parish, Louisiana · 0.9 MI S of LA 330 · Structure no. 035729523920531

Built
1982
43 years old
Condition
Fair
inspected September 2023
Type
Channel Beam
Prestressed Concrete
Length
27 ft
1 main span
Daily traffic
30
2022 count
Owner
County
County Highway Agency

About this bridge

Pelican RD over Magee Canal is a prestressed concrete channel beam carrying Pelican RD over Magee Canal in Vermilion Parish, Louisiana. It was built in 1982, so it is 43 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 30 vehicles a day, projected to reach 33 by 2042. The structure is 27 ft (8.2 m) long and 22 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPelican RD
CrossesMagee Canal
Location0.9 MI S of LA 330
RouteCounty Highway 0
Coordinates29.86924, -92.08966
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating21.8 US tons
Inventory rating13.2 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span27 ft (8.2 m)
Deck width22 ft (6.8 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic33 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pelican RD over Magee Canal built?

It was built in 1982, making it 43 years old in 2025.

What condition is Pelican RD over Magee Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Pelican RD over Magee Canal carry?

About 30 vehicles per day (2022 count).

How long is Pelican RD over Magee Canal?

The structure is 27 ft (8.2 m) long with a longest span of 27 ft (8.2 m) and a deck 22 ft wide.

Who owns Pelican RD over Magee Canal?

It is owned by the County Highway Agency.