US Bridges

Cedric RD over Grangers Canal

Good

Vermilion Parish, Louisiana · .09 MI E of Leblanc RD · Structure no. 035700000300036

Built
2000
25 years old
Condition
Good
inspected September 2023
Type
Slab
Concrete
Length
60 ft
3 main spans
Daily traffic
200
2021 count
Owner
County
County Highway Agency

About this bridge

Cedric RD over Grangers Canal is a concrete slab carrying Cedric RD over Grangers Canal in Vermilion Parish, Louisiana. It was built in 2000, so it is 25 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, projected to reach 220 by 2041. The structure is 60 ft (18.3 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCedric RD
CrossesGrangers Canal
Location.09 MI E of Leblanc RD
RouteCounty Highway 0
Coordinates30.11936, -92.1609
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.8 US tons
Inventory rating44 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span20 ft (6.1 m)
Deck width27 ft (8.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2021)
Projected traffic220 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cedric RD over Grangers Canal built?

It was built in 2000, making it 25 years old in 2025.

What condition is Cedric RD over Grangers Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Cedric RD over Grangers Canal carry?

About 200 vehicles per day (2021 count).

How long is Cedric RD over Grangers Canal?

The structure is 60 ft (18.3 m) long with a longest span of 20 ft (6.1 m) and a deck 27 ft wide.

Who owns Cedric RD over Grangers Canal?

It is owned by the County Highway Agency.