US Bridges

Elliot RD over Maree Michal Canal

Good

Vermilion Parish, Louisiana · 1.4 MI S of LA 14 · Structure no. 035700000200236

Built
2013
12 years old
Condition
Good
inspected July 2023
Type
Slab
Concrete
Length
100 ft
5 main spans
Daily traffic
243
2021 count
Owner
County
County Highway Agency

About this bridge

Elliot RD over Maree Michal Canal is a concrete slab carrying Elliot RD over Maree Michal Canal in Vermilion Parish, Louisiana. It was built in 2013, so it is 12 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 243 vehicles a day, projected to reach 267 by 2041. The structure is 100 ft (30.5 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesElliot RD
CrossesMaree Michal Canal
Location1.4 MI S of LA 14
RouteCounty Highway 0
Coordinates30.00036, -92.53084
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans5
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span20 ft (6.1 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic243 (2021)
Projected traffic267 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Elliot RD over Maree Michal Canal built?

It was built in 2013, making it 12 years old in 2025.

What condition is Elliot RD over Maree Michal Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Elliot RD over Maree Michal Canal carry?

About 243 vehicles per day (2021 count).

How long is Elliot RD over Maree Michal Canal?

The structure is 100 ft (30.5 m) long with a longest span of 20 ft (6.1 m) and a deck 27 ft wide.

Who owns Elliot RD over Maree Michal Canal?

It is owned by the County Highway Agency.