W. Beech RD over Coulee
GoodPosted for loadVermilion Parish, Louisiana · 1.5 MI E of Farmers RD · Structure no. 035700000035710
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 25 ft
- 1 main span
- Daily traffic
- 50
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
W. Beech RD over Coulee is a wood or timber stringer/multi-beam or girder carrying W. Beech RD over Coulee in Vermilion Parish, Louisiana. It was built in 2023, so it is 2 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 50 vehicles a day, projected to reach 55 by 2042. The structure is 25 ft (7.6 m) long and 19 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W. Beech RD over Coulee built?
It was built in 2023, making it 2 years old in 2025.
What condition is W. Beech RD over Coulee in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does W. Beech RD over Coulee carry?
About 50 vehicles per day (2022 count).
How long is W. Beech RD over Coulee?
The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m) and a deck 19 ft wide.
Who owns W. Beech RD over Coulee?
It is owned by the County Highway Agency.