US Bridges

US0090 over Swamp

Good

Terrebonne Parish, Louisiana · .10 Mi. from LA.20 · Structure no. 025504240709018

Built
1995
30 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
625 ft
8 main spans
Daily traffic
2,629
2021 count
Owner
State
State Highway Agency

About this bridge

US0090 over Swamp is a prestressed concrete continuous stringer/multi-beam or girder carrying US0090 over Swamp in Terrebonne Parish, Louisiana. It was built in 1995, so it is 30 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,629 vehicles a day, roughly 18% of them trucks, projected to reach 2,891 by 2041. The structure is 625 ft (190.5 m) long and 28 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesUS0090
CrossesSwamp
Location.10 Mi. from LA.20
RouteU.S. Route 90
Coordinates29.70618, -90.899
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating73 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans8 (+1 approach)
Design loadHS 20
Structure length625 ft (190.5 m)
Longest span70 ft (21.3 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,629 (2021)
Projected traffic2,891 by 2041
Trucks18%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US0090 over Swamp built?

It was built in 1995, making it 30 years old in 2025.

What condition is US0090 over Swamp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does US0090 over Swamp carry?

About 2,629 vehicles per day (2021 count), of which roughly 18% are trucks.

How long is US0090 over Swamp?

The structure is 625 ft (190.5 m) long with a longest span of 70 ft (21.3 m) and a deck 28 ft wide.

Who owns US0090 over Swamp?

It is owned by the State Highway Agency.