US Bridges

J. W. Davis DR over Creek

Good

Tangipahoa Parish, Louisiana · 2.2 Miles Southeast of US · Structure no. 625300000108104

Built
2012
13 years old
Condition
Good
inspected March 2023
Type
Slab
Concrete
Length
120 ft
6 main spans
Daily traffic
3,070
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

J. W. Davis DR over Creek is a concrete slab carrying J. W. Davis DR over Creek in Tangipahoa Parish, Louisiana. It was built in 2012, so it is 13 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,070 vehicles a day, roughly 1% of them trucks, projected to reach 3,377 by 2040. The structure is 120 ft (36.6 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesJ. W. Davis DR
CrossesCreek
Location2.2 Miles Southeast of US
RouteCounty Highway 0
Coordinates30.48586, -90.46981
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating41.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans6
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span20 ft (6.1 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,070 (2020)
Projected traffic3,377 by 2040
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was J. W. Davis DR over Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is J. W. Davis DR over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does J. W. Davis DR over Creek carry?

About 3,070 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is J. W. Davis DR over Creek?

The structure is 120 ft (36.6 m) long with a longest span of 20 ft (6.1 m) and a deck 30 ft wide.

Who owns J. W. Davis DR over Creek?

It is owned by the City or Municipal Highway Agency.