US Bridges

Redwood DR over Harrison Creek

Fair

Ouachita Parish, Louisiana · Northside of Monroe · Structure no. 053732321920651

Built
1962
63 years old
Condition
Fair
inspected August 2024
Type
Slab
Concrete
Length
26 ft
1 main span
Daily traffic
750
1980 count
Owner
City
City or Municipal Highway Agency

About this bridge

Redwood DR over Harrison Creek is a concrete slab carrying Redwood DR over Harrison Creek in Ouachita Parish, Louisiana. It was built in 1962, so it is 63 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 750 vehicles a day, projected to reach 825 by 2000. The structure is 26 ft (7.9 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRedwood DR
CrossesHarrison Creek
LocationNorthside of Monroe
RouteCounty Highway 0
Coordinates32.53369, -92.1078
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32.5 US tons
Inventory rating25 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span25 ft (7.6 m)
Deck width34 ft (10.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic750 (1980)
Projected traffic825 by 2000
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Redwood DR over Harrison Creek built?

It was built in 1962, making it 63 years old in 2025.

What condition is Redwood DR over Harrison Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Redwood DR over Harrison Creek carry?

About 750 vehicles per day (1980 count).

How long is Redwood DR over Harrison Creek?

The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 34 ft wide.

Who owns Redwood DR over Harrison Creek?

It is owned by the City or Municipal Highway Agency.