US Bridges

FH 59 over Clear Branch

Fair

Natchitoches Parish, Louisiana · No Data Entered · Structure no. 080603000002332

Built
1965
60 years old
Condition
Fair
inspected February 2025
Type
Channel Beam
Prestressed Concrete
Length
35 ft
2 main spans
Daily traffic
80
1976 count
Owner
Federal
U.S. Forest Service

About this bridge

FH 59 over Clear Branch is a prestressed concrete channel beam carrying FH 59 over Clear Branch in Natchitoches Parish, Louisiana. It was built in 1965, so it is 60 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 80 vehicles a day, projected to reach 120 by 2045. The structure is 35 ft (10.7 m) long and 25 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesFH 59
CrossesClear Branch
LocationNo Data Entered
RouteFederal Lands Road FH-59
Coordinates31.48298, -93.16478
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30 US tons
Inventory rating21.4 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckOther
Main spans2
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span18 ft (5.5 m)
Deck width25 ft (7.6 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (1976)
Projected traffic120 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FH 59 over Clear Branch built?

It was built in 1965, making it 60 years old in 2025.

What condition is FH 59 over Clear Branch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does FH 59 over Clear Branch carry?

About 80 vehicles per day (1976 count).

How long is FH 59 over Clear Branch?

The structure is 35 ft (10.7 m) long with a longest span of 18 ft (5.5 m) and a deck 25 ft wide.

Who owns FH 59 over Clear Branch?

It is owned by the U.S. Forest Service.