Elbert Stewart RD over Taylor Branch
FairPosted for loadLivingston Parish, Louisiana · 2.48 Miles NE of LA 442 · Structure no. 623230359903611
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 41 ft
- 3 main spans
- Daily traffic
- 70
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Elbert Stewart RD over Taylor Branch is a wood or timber stringer/multi-beam or girder carrying Elbert Stewart RD over Taylor Branch in Livingston Parish, Louisiana. It was built in 1980, so it is 45 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 70 vehicles a day, projected to reach 77 by 2042. The structure is 41 ft (12.5 m) long and 20 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Elbert Stewart RD over Taylor Branch built?
It was built in 1980, making it 45 years old in 2025.
What condition is Elbert Stewart RD over Taylor Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Elbert Stewart RD over Taylor Branch carry?
About 70 vehicles per day (2022 count).
How long is Elbert Stewart RD over Taylor Branch?
The structure is 41 ft (12.5 m) long with a longest span of 14 ft (4.3 m) and a deck 20 ft wide.
Who owns Elbert Stewart RD over Taylor Branch?
It is owned by the County Highway Agency.