E. Butcher Switch over Drainage Coulee
FairPosted for loadLafayette Parish, Louisiana · 0.58 MI E of I-49 · Structure no. 032830173920021
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 38 ft
- 2 main spans
- Daily traffic
- 1,122
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E. Butcher Switch over Drainage Coulee is a concrete slab carrying E. Butcher Switch over Drainage Coulee in Lafayette Parish, Louisiana. It was built in 1981, so it is 44 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,122 vehicles a day, projected to reach 1,234 by 2040. The structure is 38 ft (11.6 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E. Butcher Switch over Drainage Coulee built?
It was built in 1981, making it 44 years old in 2025.
What condition is E. Butcher Switch over Drainage Coulee in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does E. Butcher Switch over Drainage Coulee carry?
About 1,122 vehicles per day (2020 count).
How long is E. Butcher Switch over Drainage Coulee?
The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 28 ft wide.
Who owns E. Butcher Switch over Drainage Coulee?
It is owned by the City or Municipal Highway Agency.