US Bridges

High Meadow Blvd over Coulee

PoorPosted for load

Lafayette Parish, Louisiana · .4 MI N of Toronto Dr. · Structure no. 032830169920101

Built
1974
51 years old
Condition
Poor
inspected January 2024
Type
Slab
Concrete
Length
38 ft
2 main spans
Daily traffic
1,100
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

High Meadow Blvd over Coulee is a concrete slab carrying High Meadow Blvd over Coulee in Lafayette Parish, Louisiana. It was built in 1974, so it is 51 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 1,100 vehicles a day, projected to reach 1,210 by 2040. The structure is 38 ft (11.6 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHigh Meadow Blvd
CrossesCoulee
Location.4 MI N of Toronto Dr.
RouteCounty Highway 0
Coordinates30.28175, -92.01767
Functional classUrban Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating54.2 US tons
Inventory rating41.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span19 ft (5.8 m)
Deck width27 ft (8.3 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,100 (2020)
Projected traffic1,210 by 2040
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$168,000
NavigationNo navigation control on waterway

Frequently asked questions

When was High Meadow Blvd over Coulee built?

It was built in 1974, making it 51 years old in 2025.

What condition is High Meadow Blvd over Coulee in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.

How much traffic does High Meadow Blvd over Coulee carry?

About 1,100 vehicles per day (2020 count).

How long is High Meadow Blvd over Coulee?

The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 27 ft wide.

Who owns High Meadow Blvd over Coulee?

It is owned by the City or Municipal Highway Agency.