W. Bayou Pkwy over Mine Coulee Cut-Off Cana
FairPosted for loadLafayette Parish, Louisiana · 0.47M West of LA 3025 · Structure no. 032830116920171
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 5,000
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W. Bayou Pkwy over Mine Coulee Cut-Off Cana is a concrete continuous stringer/multi-beam or girder carrying W. Bayou Pkwy over Mine Coulee Cut-Off Cana in Lafayette Parish, Louisiana. It was built in 1993, so it is 32 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 5,000 vehicles a day, projected to reach 5,500 by 2040. The structure is 120 ft (36.6 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W. Bayou Pkwy over Mine Coulee Cut-Off Cana built?
It was built in 1993, making it 32 years old in 2025.
What condition is W. Bayou Pkwy over Mine Coulee Cut-Off Cana in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does W. Bayou Pkwy over Mine Coulee Cut-Off Cana carry?
About 5,000 vehicles per day (2020 count).
How long is W. Bayou Pkwy over Mine Coulee Cut-Off Cana?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 47 ft wide.
Who owns W. Bayou Pkwy over Mine Coulee Cut-Off Cana?
It is owned by the City or Municipal Highway Agency.