US Bridges

Sarah Dee Pkwy. over Coulee

Fair

Lafayette Parish, Louisiana · 0.085 Miles NE of Tolson · Structure no. 032830091920051

Built
1978
47 years old
Condition
Fair
inspected October 2023
Type
Slab
Concrete
Length
38 ft
2 main spans
Daily traffic
280
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sarah Dee Pkwy. over Coulee is a concrete slab carrying Sarah Dee Pkwy. over Coulee in Lafayette Parish, Louisiana. It was built in 1978, so it is 47 years old, older than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 280 vehicles a day, projected to reach 308 by 2040. The structure is 38 ft (11.6 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSarah Dee Pkwy.
CrossesCoulee
Location0.085 Miles NE of Tolson
RouteCounty Highway 0
Coordinates30.15533, -92.00927
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating37.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span19 ft (5.8 m)
Deck width27 ft (8.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic280 (2020)
Projected traffic308 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sarah Dee Pkwy. over Coulee built?

It was built in 1978, making it 47 years old in 2025.

What condition is Sarah Dee Pkwy. over Coulee in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Sarah Dee Pkwy. over Coulee carry?

About 280 vehicles per day (2020 count).

How long is Sarah Dee Pkwy. over Coulee?

The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 27 ft wide.

Who owns Sarah Dee Pkwy. over Coulee?

It is owned by the City or Municipal Highway Agency.