New Comer Rd. over Gully
FairPosted for loadJefferson Davis Parish, Louisiana · 0.8 MI W of Dewolf RD · Structure no. 072730184925971
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Concrete
- Length
- 57 ft
- 3 main spans
- Daily traffic
- 40
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
New Comer Rd. over Gully is a concrete slab carrying New Comer Rd. over Gully in Jefferson Davis Parish, Louisiana. It was built in 1971, so it is 54 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 40 vehicles a day, projected to reach 44 by 2039. The structure is 57 ft (17.4 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Comer Rd. over Gully built?
It was built in 1971, making it 54 years old in 2025.
What condition is New Comer Rd. over Gully in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does New Comer Rd. over Gully carry?
About 40 vehicles per day (2019 count).
How long is New Comer Rd. over Gully?
The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 23 ft wide.
Who owns New Comer Rd. over Gully?
It is owned by the County Highway Agency.