US Bridges

Gracie LN over Levee Barrow Pit

Fair

Iberville Parish, Louisiana · 0.9 MI NW of LA 75 · Structure no. 612400000610393

Built
2017
8 years old
Condition
Fair
inspected December 2024
Type
Slab
Concrete
Length
140 ft
7 main spans
Daily traffic
681
2022 count
Owner
County
County Highway Agency

About this bridge

Gracie LN over Levee Barrow Pit is a concrete slab carrying Gracie LN over Levee Barrow Pit in Iberville Parish, Louisiana. It was built in 2017, so it is 8 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 681 vehicles a day, projected to reach 749 by 2042. The structure is 140 ft (42.7 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGracie LN
CrossesLevee Barrow Pit
Location0.9 MI NW of LA 75
RouteCounty Highway 0
Coordinates30.16224, -91.34068
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.6 US tons
Inventory rating48.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans7
Design loadGreater than HL 93
Structure length140 ft (42.7 m)
Longest span20 ft (6.1 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic681 (2022)
Projected traffic749 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gracie LN over Levee Barrow Pit built?

It was built in 2017, making it 8 years old in 2025.

What condition is Gracie LN over Levee Barrow Pit in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Gracie LN over Levee Barrow Pit carry?

About 681 vehicles per day (2022 count).

How long is Gracie LN over Levee Barrow Pit?

The structure is 140 ft (42.7 m) long with a longest span of 20 ft (6.1 m) and a deck 31 ft wide.

Who owns Gracie LN over Levee Barrow Pit?

It is owned by the County Highway Agency.