Wilison-Clinton RD over Drainage Creek
PoorPosted for loadEast Feliciana Parish, Louisiana · 3.9 M E of LA 19 · Structure no. 611930534910351
- Built
- 1994
- 31 years old
- Condition
- Poor
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 76 ft
- 4 main spans
- Daily traffic
- 84
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Wilison-Clinton RD over Drainage Creek is a wood or timber stringer/multi-beam or girder carrying Wilison-Clinton RD over Drainage Creek in East Feliciana Parish, Louisiana. It was built in 1994, so it is 31 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 84 vehicles a day, projected to reach 92 by 2040. The structure is 76 ft (23.2 m) long and 21 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wilison-Clinton RD over Drainage Creek built?
It was built in 1994, making it 31 years old in 2025.
What condition is Wilison-Clinton RD over Drainage Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does Wilison-Clinton RD over Drainage Creek carry?
About 84 vehicles per day (2020 count).
How long is Wilison-Clinton RD over Drainage Creek?
The structure is 76 ft (23.2 m) long with a longest span of 19 ft (5.8 m) and a deck 21 ft wide.
Who owns Wilison-Clinton RD over Drainage Creek?
It is owned by the County Highway Agency.